Service line
Surgical Equipment
OR lights, booms, and monitors; cameras, speakers, and nurse stations; cabinets and Clean Suites — installed with the overhead structural supports and the coordination with biomedical teams and facility engineering in one scope. Structural, electrical, and ceiling work handled together.
What this work is
Nothing in a modern OR hangs from a ceiling that was designed for ceiling tile. A boom or a light needs engineered support above the finished ceiling, and that support has to be in place — at the right location, at the right height — before the equipment arrives. We install the Accu-Mount structural support and the equipment it carries as one scope, sequenced so the ceiling work happens first and the ceiling is ready when the booms arrive.
The rest is the same discipline applied to everything else in the room: monitors and cameras placed per the manufacturer's manual, speakers and nurse stations where the workflow needs them, cabinets and Clean Suites installed to finish the room. Coordination runs with your biomedical teams and facility engineering, the work stays under containment in sterile and surgical environments, and because the same crew is cross-trained in each trade involved, the seams between structural, electrical, and ceiling work stay inside one team.
The equipment we install
Everything that hangs, mounts, or finishes the surgical room
Set on engineered overhead support and connected per the manufacturer's installation manual — the structural support installed ahead of the equipment.
Ceiling- and wall-mounted displays installed with the structural provisions and routing the position requires.
Placed for the room's workflow, connected, and tied into the systems already in the room.
Installed to finish the room — level, sealed, and detailed so it stays cleanable.
Why one scope matters
Structural, electrical, and ceiling work — handled together.
When the steel crew and the equipment installer are different companies, the seam is where the schedule breaks. We close it.
Structure first, by design
Overhead support goes in before the equipment arrives — the hardest work in the room happens while the room is already open for it, not in a second mobilization.
Coordination with your teams
Biomedical teams and facility engineering are coordinated with on positions, utilities, and startup, so the equipment arrives into a room that is actually ready for it.
Cross-trained crews
Every crew member is cross-trained in each trade involved in an install, so one team carries the project from the ceiling steel to the equipment to the integration rack.
Questions facilities ask
Frequently asked
Do you do the overhead structural work, or do we need a separate steel contractor?
Can an OR suite be updated while other rooms stay in service?
Who verifies the installation is complete?
Planning an OR update?
Call or email with the room, the equipment, and the timeline — we will respond with the right information.
The integration side of the room
Cabling, surgical AV, racks, and startup for integrated ORs — in the same one-scope model.