Sterile Processing Equipment
Washer-disinfectors and cart washers, steam and low-temperature sterilizers, ultrasonic cleaners, and workflow and instrument-tracking systems — installed to AAMI, AORN, and manufacturer specifications, inside occupied facilities, with the least possible downtime.
What this work is
A sterile processing build-out is heavy equipment going into a room that has to stay clean. The sequence matters: the structural and utility provisions first, then the equipment set and connected, then tied into the systems already in the building so everything works together on day one. We carry that sequence as one scope, and the same crew that handles the rough-in handles the install — every crew member is cross-trained in each trade involved.
Because most of this work happens inside occupied buildings, containment is part of the job. Our crews are trained to understand ICRA requirements and work under containment in sterile and surgical environments, and each install is planned around your schedule and your infection-control requirements. New equipment is tied into existing systems, and the record — progress pictures, RFIs, and punch lists — is something you can hand to your regulatory readiness team.
The equipment we install
Installed to AAMI, AORN, and manufacturer specifications
The manufacturer's installation manual is followed in detail on every unit.
Set, connected, and tied into the building's systems per the installation manual, with the structural and utility provisions ready before delivery.
Installed to the manufacturer's clearances and specifications, with startup documented through the punch list.
Set and connected where the workflow calls for them.
Installed alongside the equipment and integrated with the systems already in the room, with documentation and validation support through startup.
Inside an occupied facility
The department keeps running while the work happens.
Containment by training
Crews are trained to understand ICRA requirements and work under containment in sterile and surgical environments — the containment is part of the plan before mobilization, not improvised on site.
Planned around your schedule
We work inside occupied buildings every day. Faster installation timelines and tight coordination keep your SPD turning over on schedule, with the least possible downtime.
A record for your regulatory readiness team
Progress pictures, RFIs, and punch lists built as the work happens — documentation and validation support through startup.
Questions facilities ask
Frequently asked
Will your crews work under our infection-control requirements?
Can you install while SPD stays in service?
Whose standard governs the installation?
Will the new equipment work with the systems already in the room?
Tell us about your SPD project.
Call or email with the room, the equipment, and the timeline — facility and manufacturer inquiries are answered directly by the ownership team.
Buying from a manufacturer we represent?
We install for OEMs and distributors directly. See what we handle on their behalf.