Sterile Processing Equipment

Washer-disinfectors and cart washers, steam and low-temperature sterilizers, ultrasonic cleaners, and workflow and instrument-tracking systems — installed to AAMI, AORN, and manufacturer specifications, inside occupied facilities, with the least possible downtime.

What this work is

A sterile processing build-out is heavy equipment going into a room that has to stay clean. The sequence matters: the structural and utility provisions first, then the equipment set and connected, then tied into the systems already in the building so everything works together on day one. We carry that sequence as one scope, and the same crew that handles the rough-in handles the install — every crew member is cross-trained in each trade involved.

Because most of this work happens inside occupied buildings, containment is part of the job. Our crews are trained to understand ICRA requirements and work under containment in sterile and surgical environments, and each install is planned around your schedule and your infection-control requirements. New equipment is tied into existing systems, and the record — progress pictures, RFIs, and punch lists — is something you can hand to your regulatory readiness team.

The equipment we install

Installed to AAMI, AORN, and manufacturer specifications

The manufacturer's installation manual is followed in detail on every unit.

Washers
Washer-disinfectors and cart washers

Set, connected, and tied into the building's systems per the installation manual, with the structural and utility provisions ready before delivery.

Sterilizers
Steam and low-temperature sterilizers

Installed to the manufacturer's clearances and specifications, with startup documented through the punch list.

Ancillary
Ultrasonic cleaners

Set and connected where the workflow calls for them.

Workflow
Workflow and instrument-tracking systems

Installed alongside the equipment and integrated with the systems already in the room, with documentation and validation support through startup.

Inside an occupied facility

The department keeps running while the work happens.

Containment by training

Crews are trained to understand ICRA requirements and work under containment in sterile and surgical environments — the containment is part of the plan before mobilization, not improvised on site.

Planned around your schedule

We work inside occupied buildings every day. Faster installation timelines and tight coordination keep your SPD turning over on schedule, with the least possible downtime.

A record for your regulatory readiness team

Progress pictures, RFIs, and punch lists built as the work happens — documentation and validation support through startup.

Questions facilities ask

Frequently asked

Will your crews work under our infection-control requirements?
Yes — that is the baseline. Crews are trained to understand ICRA requirements and work under containment in sterile and surgical environments. Each install is planned around your schedule and your facility's infection-control requirements before mobilization.
Can you install while SPD stays in service?
That is the normal case. We work inside occupied buildings every day and plan each install around your schedule; faster installation timelines and tight coordination keep your ORs and SPD turning over on schedule, with the least possible downtime.
Whose standard governs the installation?
The manufacturer's installation manual, followed in detail — plus AAMI and AORN guidance, and your facility's requirements. Following the manual is key to a successful installation; when unique installation challenges arise, we problem-solve on top of the manual, and questions become RFIs with answers on record.
Will the new equipment work with the systems already in the room?
That is the goal we install to: new equipment is tied into existing systems so everything in the room works together on day one, with documentation and validation support through startup.

Tell us about your SPD project.

Call or email with the room, the equipment, and the timeline — facility and manufacturer inquiries are answered directly by the ownership team.

Contact page →

Buying from a manufacturer we represent?

We install for OEMs and distributors directly. See what we handle on their behalf.

Planned installation or a bid in flight

Tell us the room, the equipment, and the timeline.

Facility and manufacturer inquiries are answered directly by the ownership team. contact us or follow the work on LinkedIn — we reply within one business day.

SteriTech direct line(402) 200-8863