Structural Support Systems
Accu-Mount™ overhead support systems by Healthcare Technology Corporation — pre-engineered steel for surgical lights, booms, monitors, and microscopes, installed ahead of the equipment so the ceiling is ready when the booms arrive.
What this work is
Booms, lights, monitors, and microscopes all hang from steel that has to be engineered and installed above the finished ceiling — inside a room that is usually already built. Accu-Mount is a pre-engineered support system built for exactly that problem: steel support sized for the equipment it carries, from exam lights through anesthesia booms and tandem configurations, designed before it reaches the site so the field work is precise rather than improvised.
We install it ahead of the equipment, as part of the same contract. That sequencing is the whole point: the hardest work in the room happens before the equipment mobilization, and when the light or boom truck arrives, the support is already in place. The systems are compatible with the major light and boom manufacturers, so the facility's equipment choice is never tied to the structure — and the crew that sets the steel is the crew that later sets the equipment, one scope, structural, electrical, and ceiling work handled together.
The system
Accu-Mount™ by Healthcare Technology Corporation
The pre-engineered line covers everything from exam lights through anesthesia booms and tandem configurations.
Pre-engineered steel for the equipment that hangs in surgical and procedural rooms.
Compatible with the major manufacturers, so the facility's equipment choice is never tied to the structure.
Structure first, by design — the ceiling is ready when the booms arrive, and the hardest work in the room happens before the equipment mobilization.
Why structure first
Two mobilizations into one room cost twice the disruption.
One opening of the room
Overhead steel means ceiling work, and ceiling work means containment. Doing it in the same mobilization as the equipment keeps the room opened once, not twice — with the least possible downtime.
Engineered, not adapted
Pre-engineered support means the field crew installs a designed system instead of fabricating a solution above the ceiling — and the record reflects that.
The same crew both days
Cross-trained crews carry the project from the steel to the equipment, coordinated with your biomedical teams and facility engineering through startup.
Questions facilities and OEMs ask
Frequently asked
Can you install support for a boom or light we already own?
How does the steel work happen in an occupied hospital?
Who engineers the support?
Send us the equipment and the room.
Model, manufacturer, location, and timeline — that is enough for us to respond with the right information.
What hangs from it
OR lights, booms, and monitors — installed by the same crew, in the same scope, after the steel is in.