Who we serve
Healthcare Facilities
For Surgery and Sterile Processing directors, facility managers, biomedical engineering, and healthcare construction contractors. We work inside occupied buildings every day and plan each install around your schedule and your infection-control requirements.
How we work in your facility
SteriTech was founded in 2024 by healthcare professionals, not equipment salespeople — a registered nurse with more than 25 years in clinical, regulatory, and quality leadership, and a healthcare facility executive with more than 20 years across the healthcare built environment. We know what your regulatory readiness team needs in the file, because our founders came from the side of the wall that answers to it. Installations are run to match: containment before construction, the manufacturer's manual followed in detail, and a record written as the work happens.
Washer and sterilizer rooms, boom and light installs, and integration racks go in with ICRA-compliant containment — crews trained to understand ICRA requirements and to work under containment in sterile and surgical environments. Downtime is engineered out: faster installation timelines and tight coordination keep your ORs and SPD turning over on schedule. New equipment is tied into existing systems so everything works together on day one. And because structure, equipment, and integration sit in one scope with cross-trained crews, the seams where multi-vendor projects come apart stay inside our company.
Who we work for, in your building
- Surgery directors
- Sterile Processing directors
- Facility managers
- Biomedical engineering
- Healthcare construction contractors
Four service lines, one standard
How each scope runs in an occupied facility
Choose a service line to see what it means for your department.
Sterile processing equipment
The department keeps turning instruments while the new units go in.
Washer-disinfectors and cart washers, steam and low-temperature sterilizers, ultrasonic cleaners, and workflow and instrument-tracking systems — installed to AAMI, AORN, and manufacturer specifications.
Each install is planned around your schedule and your infection-control requirements, with crews trained to work under containment in sterile and surgical environments. New equipment is tied into existing systems so everything in the room works together on day one.
Full equipment list and the questions SPD teams ask.
Surgical equipment
OR suites update room by room, not all at once.
OR lights, booms, and monitors; cameras, speakers, and nurse stations; cabinets and Clean Suites — with coordination with biomedical teams and facility engineering.
Structural, electrical, and ceiling work are handled in one scope, sequenced so the overhead support is in place before the equipment arrives. Startup is coordinated with your biomedical teams, and the work stays under containment in sterile and surgical environments.
What we install, why one scope matters, and the OR questions we hear most.
Integration equipment
The room comes up as one system, not a pile of parts.
OR integration cabling and equipment, surgical audio-visual systems, and rack build-out, termination, and startup.
Integration is interoperable with the systems already in the room, and the last stretch — punch lists, interoperability, and the close-out file — is carried through startup with documentation and validation support.
Scope, coordination model, and how validation support works.
Structural support systems
The ceiling is ready before the boom arrives.
Accu-Mount™ pre-engineered support — Series 100, 200, and 300, from exam lights through anesthesia booms and tandem configurations.
Installing the steel in the same mobilization as the equipment opens the room once instead of twice, and puts the hardest work while the room is already down. The systems are compatible with the major light and boom manufacturers, so your equipment choice is never tied to the structure.
The system, the sequencing, and what we need from you to scope the support.
The record
What your regulatory readiness team gets after we leave
Documentation and validation support through startup — the file is built as the work happens.
Actionable items and critical conversations emphasized, every day of the job.
The room as it was found, as it is worked, and as it is left.
Design and site conflicts raised as RFIs with the answers on record.
Punch list items tracked for startup — documentation and validation support you can hand to your regulatory readiness team.
Questions